Critical Path Partners

by criticalpathpartners.ca in Other

MCP serverPassing, checked 8 h ago

Primavera P6 XER forensic scheduling: AACE windows, TIA, impacted as-planned, DCMA-14, Monte Carlo.

https://mcp.criticalpathpartners.ca/mcp
Tools
14
open to any client
Uptime
100%
last 30 days
Response time
431 ms
471 ms slowest 5%
Last check
Passed
8 h ago, next any minute now

Scan it nowHow to connect

Reliability

All checks passedSome failedAll failedNot checked

Status and outage history · Atom feed · Watch with other listings

How to connect

Add it to any MCP client that supports remote servers.

{
  "mcpServers": {
    "critical-path-partners": {
      "type": "http",
      "url": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}

14 tools

  • forensic_windows_analysis

    Run forensic windows analysis (AACE RP 29R-03 §3.3, MIP 3.3 Observational / Dynamic / Contemporaneous As-Is) across multiple Primavera P6 XER snapshots and return the full analysis dict. This is the headline forensic tool — it…

  • concurrent_delay_matrix

    Build the per-window x per-party concurrent-delay attribution matrix from a chronological list of XER snapshots. Implements the per-window concurrency view per AACE RP 29R-03 §3.3.I (apportionment) and §4.2 (concurrency). Where…

  • woet_classifier

    Worked-vs-On-time Execution Timeline (WOET) per-activity day-by-day classification of as-built execution against baseline. For each pairable activity (matched by ``task_code``), classifies execution into 4 day-states…

  • slip_velocity

    Per-window slip velocity & acceleration trend across XER snapshots. Computes three signed metrics per window from the underlying forensic windows analysis: - slip_velocity_days_per_day: completion shift / window duration…

  • collapsed_as_built

    Collapsed As-Built / But-For analysis on a post-impact XER. Implements AACE RP 29R-03 §3.8 Modeled / Subtractive / Single Simulation method (paired with MIP 3.3 Windows for the dual-method gap report per SCL §11.5). Validates a forensic…

  • time_impact_analysis_fragnet

    Time Impact Analysis (TIA) — prospective fragnet insertion into a pre-impact baseline schedule. Supports two modes. **Single-base mode** (legacy): supply ``baseline_xer_path`` or ``baseline_xer_content``. All fragnets are inserted into the…

  • impacted_as_planned

    Impacted As-Planned (IAP) on an unprogressed as-planned baseline. Implements AACE RP 29R-03 MIP 3.6 (Modeled / Additive / Single Base) and SCL Protocol 2nd ed. §11.6(a). Two modes. **screen** (default): inserts each delay fragnet…

  • critical_path_validator

    Critical-path validation, logic health, and DCMA-14 assessment of a Primavera P6 schedule. Runs the CPP critical-path validator: checks for false criticality, constraint-driven CP segments, open ends, broken logic, and surfaces a…

  • dcma14_health_check

    Full Schedule Health Dashboard HTML report — DCMA-14 + CPLI + BEI + variance/slip register against the baseline. Wraps the CPP Schedule Health Review skill, which produces a self-contained ~1.3 MB HTML dashboard. The dashboard renders…

  • path_explorer

    Logic-trace driver-chain explorer — answers "WHY is this activity critical?" and "WHAT does it drive?". Traces driving predecessors backward from a target activity to project start (the "why critical" chain) and/or driving…

  • monte_carlo_p50_p80

    Monte Carlo Schedule Risk Analysis — P10/P50/P80/P90 completion-date forecast for a Primavera P6 schedule. Implements an AACE-style quantitative SRA (the same math as CPP's browser Tool_11 Portfolio Risk Engine, scripted Python…

  • qramm_maturity

    QRAMM-aligned maturity reading for an SRA result. Places a Schedule Risk Analysis run (from ``monte_carlo_p50_p80`` or any equivalent dict) on the five named maturity levels of AACE RP 122R-22 (Quantitative Risk Analysis Maturity…

  • claim_workbench_evidence_ledger

    Forensic claim workbench — analyzes a folder of mixed evidence (XER chain + MSG/PDF/DOCX/XLSX correspondence) and produces a unified workbench dashboard. Built from the real-world workflow where forensic delay analysis starts from…

  • xer_parser

    Parse a Primavera P6 XER file and return a TABLE SUMMARY (not the full row-level data — XER row dumps explode the MCP context window). For each table in the XER, returns the table name, field list, and record count. Per-row data is intentionally…

Security scan

12 findings

  • Unusually long description in tool:forensic_windows_analysis
    forensic_windows_analysis (forensic windows analysis) Run forensic windows analy…
  • Unusually long description in tool:concurrent_delay_matrix
    concurrent_delay_matrix (concurrent delay matrix) Build the per-window x per-par…
  • Unusually long description in tool:woet_classifier
    woet_classifier (woet classifier) Worked-vs-On-time Execution Timeline (WOET) pe…
  • Unusually long description in tool:slip_velocity
    slip_velocity (slip velocity) Per-window slip velocity & acceleration trend acro…
  • Unusually long description in tool:collapsed_as_built
    collapsed_as_built (collapsed as built) Collapsed As-Built / But-For analysis on…
  • Unusually long description in tool:time_impact_analysis_fragnet
    time_impact_analysis_fragnet (time impact analysis fragnet) Time Impact Analysis…
  • Unusually long description in tool:impacted_as_planned
    impacted_as_planned (impacted as planned) Impacted As-Planned (IAP) on an unprog…
  • Unusually long description in tool:critical_path_validator
    critical_path_validator (critical path validator) Critical-path validation, logi…
  • Unusually long description in tool:dcma14_health_check
    dcma14_health_check (dcma14 health check) Full Schedule Health Dashboard HTML re…
  • Unusually long description in tool:monte_carlo_p50_p80
    monte_carlo_p50_p80 (monte carlo p50 p80) Monte Carlo Schedule Risk Analysis — P…
  • Unusually long description in tool:qramm_maturity
    qramm_maturity (qramm maturity) QRAMM-aligned maturity reading for an SRA result…
  • Unusually long description in tool:claim_workbench_evidence_ledger
    claim_workbench_evidence_ledger (claim workbench evidence ledger) Forensic claim…