72trust / 100

Portravo Construction Takeoff

by portravo.com in Other

MCP serverPassing, checked 9 h ago

Review construction plan takeoffs and download reviewed estimates with Portravo account linking.

https://portravo.com/mcp
Tools
10
open to any client
Uptime
97.2%
last 30 days
Response time
1.5 s
3.2 s slowest 5%
Last check
Passed
9 h ago, next any minute now

Scan it nowHow to connect

Reliability

All checks passedSome failedAll failedNot checked

Status and outage history · Atom feed · Watch with other listings

How to connect

Add it to any MCP client that supports remote servers.

{
  "mcpServers": {
    "portravo-construction-takeoff": {
      "type": "http",
      "url": "https://portravo.com/mcp"
    }
  }
}

10 tools

  • preflight_takeoff

    Before creating or starting a takeoff, inspect current automatic/team-assisted trades, the exact existing-credit requirement, balance, upload limits and review link. Supply either project_id or proposed trades, or neither to discover availability. Does not reserve credits, start…

  • get_takeoff_status

    Read an owned project and its latest asynchronous takeoff progress, completion limitations and review link. Never advances or restarts a run, uses credits or changes billing. Poll this tool after run_takeoff returns a running result.

  • get_profile

    Identify the signed-in Portravo account after OAuth account linking.

  • list_projects

    Find construction projects in the connected Portravo account, including draft, review, priced and final estimates. Returns 50 projects per page; nextOffset is the offset of the next page, or null on the last page.

  • get_takeoff

    Read an owned construction project's plan files (attached from chat or uploaded in Portravo) and extracted takeoff quantities, trades, confidence and human review status. reviewRequired reports whether any line still needs estimator review. Quantities require estimator review…

  • list_pricing_markets

    List the regional construction pricing markets supported by Portravo. The returned markets are the accepted metro_code values for create_project.

  • create_project

    Create a new construction estimate project in the connected Portravo account from a project name, an explicit trades selection returned by preflight_takeoff, an optional address and an optional supported metro_code. Trades are required for customer projects; only the isolated…

  • attach_plan_pdf

    Attach a PDF the user selected in this conversation as the first plan for a new Portravo project. Plan PDFs must be 10 MiB or smaller. Accepts exactly one of plan, a host-provided download_url and file_id, or plan_inline, canonical base64 of the exact user-uploaded PDF bytes…

  • run_takeoff

    Run the initial AI takeoff for a new project whose plan PDF was attached with attach_plan_pdf or uploaded by the user on the project page in Portravo. Call preflight_takeoff first and obtain approval for its selected trades and creditsRequired. Set confirmed_trades to the…

  • export_reviewed_estimate

    Get a short-lived Excel XLSX download for an owned Portravo estimate after every takeoff line has been reviewed and the estimate is priced or final. If review is incomplete, the call returns a review_required error with the Portravo review link, where quantities, assembly…

Security scan

No findings

We scan names, descriptions and tool definitions for hidden instructions and other prompt-injection patterns.

Recent checks

WhenResultHTTPTime
9 h agoPassed2001.6 s
21 h agoPassed2003.3 s
33 h agoPassed2001.4 s
45 h agoPassed2003.2 s
2 days agoPassed2001.6 s
Show 10 older checks
3 days agoPassed2001.8 s
3 days agoPassed2001.7 s
4 days agoPassed200124 ms
4 days agoPassed2001.9 s
5 days agoPassed200165 ms
5 days agoPassed2001.7 s
5 days agoPassed2001.4 s
6 days agoPassed2001.6 s
6 days agoPassed2001.1 s
7 days agoPassed2001.5 s