Rotase
by rotase.com in Documents & files
Employee scheduling, staffing feasibility, localized demos, schedule reports and CSV export.
https://rotase.com/mcp
Last 30 days
- Uptime
- 100%
- Response time
- 253 ms typical, 253 ms slowest 5%
- Last check
- 2 h ago
- Next check
- in 5 h
How to call it
Add it to any MCP client that supports remote servers.
{
"mcpServers": {
"rotase": {
"type": "http",
"url": "https://rotase.com/mcp"
}
}
}8 tools
- rotase_health
Read-only check that the Rotase scheduling service is available. Use this when connectivity or service availability is uncertain. It does not require a project and does not change data.
- rotase_examples
Read an example store, employees and complete project payload. Defaults to English labels; pass a supported language code to localize names. Call this when the project structure or field names are unknown. The returned project can be copied and edited before validation. This oper
- rotase_create_demo_project
Create a localized demonstration project using the same project-creation operation as the Rotase API. The server chooses the current period in the requested timezone, loads the localized demo names and company name, applies the selected country calendar and can generate an initia
- rotase_validate_project
Validate a complete Rotase project payload without saving or modifying it. Use rotase_examples first if the payload shape is unknown. Call this before feasibility checks or schedule generation. The input is the project object itself, not a wrapper with an additional "project" pro
- rotase_generate_schedule
Generate a monthly employee schedule from a complete Rotase project payload. Use rotase_examples to obtain a template, then rotase_validate_project first. The operation calculates and returns a schedule; it does not save a project, modify browser storage or create an account. Exp
- rotase_check_feasibility
Check whether a complete Rotase project can satisfy opening hours, staffing requirements, availability, rest rules and work-hour limits. Use after rotase_validate_project and before generation when the user asks whether a schedule is possible. This operation is read-only and does
- rotase_schedule_report
Calculate per-store and per-employee statistics for a generated monthly schedule. Pass the complete project object and either provide the generated schedule as the top-level "schedule" property or put it in the project schedules array. This operation is read-only and does not sav
- rotase_export_csv
Export a generated monthly schedule as spreadsheet-compatible CSV. Pass the complete project object and either provide the generated schedule as the top-level "schedule" property or put it in the project schedules array. The response contains the CSV text; nothing is saved on the
Security scan
- No findings. We scan names, descriptions and tool definitions for hidden instructions and other prompt-injection patterns.
Recent checks
| When | Result | HTTP | Time |
|---|---|---|---|
| 2 h ago | Passed | 200 | 253 ms |
| 11 h ago | Passed | 200 | 401 ms |